Industrial and process plant
Pipe racks, platforms, access steel and equipment support structures, where the documentation an auditor will accept is as much of the deliverable as the steel.
| Number | Document | Rev | State | By others |
|---|---|---|---|---|
| 1 The specification is the job | ||||
| DEMO-CLI-ZZ-XX-SP-S-0001 | Project specification, structural steel | C01 | Published | Client |
| 2 Documentation depth is a deliverable, not an afterthought | ||||
| DEMO-SEI-ZZ-XX-SH-Z-0012 | Certificate set index | P01 | WIP | |
| DEMO-SEI-ZZ-XX-SH-Z-0013 | Closeout documentation register | P01 | WIP | |
| 3 Equipment vendor data arrives late | ||||
| DEMO-SEI-ZZ-XX-SH-Z-0003 | Vendor documents register | P01 | Shared | |
| DEMO-VEN-ZZ-XX-DR-M-0001 | Vendor data, pump skid | Vendor | ||
| DEMO-VEN-ZZ-XX-DR-M-0002 | Vendor data, compressor package | Vendor | ||
Dashed line: By others Dotted line: Not yet issued
Plant steel is repetitive and unforgiving. A pipe rack is the same bent forty times, which makes an error in the bent an error forty times, and the governing document is usually not a building code but a client specification that overrides it in a dozen specific places — weld acceptance, coating system, bolt grade, minimum member thickness, marking convention.
The specification is the job
The first work on a plant job is reading the specification and listing every place it departs from the base code, because that list is what the design, the detailing and the inspection plan all have to be built against. Where a clause is ambiguous, it is raised before it is interpreted. An interpretation made quietly is the single most expensive habit in this sector.
Documentation depth is a deliverable, not an afterthought
Owners in this sector are audited, so the material certificates, weld records, NDT results and coating records are part of what is being bought. They are collected as the work happens and indexed to the pieces they cover — see closeout documentation for what the package contains, and how we work for the inspection points that produce it.
Equipment vendor data arrives late
It always does. What can be designed around it is designed around it — adjustable supports, holes deferred to a later release, a lot boundary that isolates the affected structure — so that the whole rack does not wait on one vendor's general arrangement drawing.


The pages that carry this work
Not all of them. These are the ones that decide how a job in this sector turns out.
Structural engineering
Steel & fabrication engineering
Steel detailing
Shop drawings, erection drawings, CNC files, bolt lists and advance bills of material, produced from a model the shop can build from without interpreting it.Connection design
Connection calculations, sketches and schedules, checked against the governing code and against what the shop selected for the job can actually fabricate.
Construction coordination and project controls
Industrial & specialty structures
Send the scope
A model, a drawing set or a written description. The specification and the required-on-site date tell us more than the size of the job does.